Commercial EV Chargers

44 East Condos EV Charging Infrastructure

Downtown Austin, TX Completed 2025 44 East Ave, Austin 78701
Siemens 84-circuit commercial panel installed at 44 East Condos for EV charger project

Project Overview

44 East Condos, one of Downtown Austin's premier residential high-rises, needed comprehensive electrical infrastructure to support EV charging across their parking garage. The building's HOA contracted Texas Electric and Light to design and install the complete electrical backbone - panels, conduit, and dedicated outlets on each floor - giving residents the flexibility to connect their preferred EV chargers in the future.

This project required running new electrical service up through all 9 floors of the parking garage, installing dedicated sub-panels on each level, and providing 44 individual outlets ready for hardwire or plug-in EV charger connections. The infrastructure-first approach gives the building maximum flexibility for various charger types and future expansion.

Scope of Work

EV-Ready Outlets

  • • 44 dedicated EV charging outlets
  • • NEMA 14-50 receptacles
  • • Hardwire or plug-in ready
  • • Future charger flexibility

Electrical Infrastructure

  • • 9 new Siemens sub-panels
  • • 84-circuit commercial panels
  • • New service feeds per floor
  • • Conduit runs through garage

Project Challenges

Multi-Floor Coordination

Running new electrical service through 9 floors of an occupied parking garage required careful scheduling to minimize resident disruption and maintain garage access.

Future-Proof Design

Designing the electrical infrastructure to accommodate various charger types and potential future expansion while staying within the building's existing service capacity.

Concrete Construction

Running conduit through concrete parking structure required precision core drilling and surface-mounted solutions while maintaining structural integrity.

Project Results

44
EV-Ready Outlets
9
Floors Served
9
New Sub-Panels
100%
On Schedule

Project Details

Project Type
EV Charging Infrastructure
Location
44 East Ave #100
Austin, TX 78701
Building Type
Residential Condominium
Year Completed
2025
Equipment
Siemens 84-circuit panels
NEMA 14-50 outlets

Have a Similar Project?

We specialize in EV charging infrastructure for condos, apartments, and commercial properties - from planning to installation.

Call 512-547-4130 Request a Quote

More Commercial Projects

Ready to Make Your Building EV-Ready?

From single outlets to full building infrastructure, we design and install EV charging electrical systems for any property.

Call Now Book Online